Stock footage

Phase 03

Caxyo supports selected pharmaceutical, API, intermediate, specialty-chemical and OTC-related programs from process development through scale-up and manufacturing support.

The model combines flow chemistry, batch chemistry and hybrid architectures so the manufacturing route follows the molecule. A developed process can move toward a campaign: modular equipment sized to the required throughput, integration with upstream and downstream steps, and monitoring appropriate to the quality system in force.

Read the detail

A flow-as-a-service or output-linked engagement is discussed only when facility status, licences, the quality system and the basis of supply have been confirmed. It is not a standing offer on this website.

Service stages

A program may use one stage. Later stages are not assumed.

Early development

  • Route review
  • Reaction screening
  • Flow feasibility
  • Hazard and process-safety review
  • Non-GMP process development, subject to facility scope

Clinical and pilot preparation

  • Process optimization
  • Equipment selection
  • Scale-up studies
  • Continuous-run confirmation
  • Work-up and isolation development
  • Documentation and transfer package

Manufacturing support

  • Batch, flow or hybrid campaign support
  • Process transfer
  • Production planning
  • In-process monitoring
  • Deviation and change-control support
  • Lifecycle improvement

Commercial readiness

  • Process validation support
  • Continued process verification support
  • Regulatory documentation inputs
  • Supply-chain and raw-material review
  • Post-transfer technical support

Program models

Commercial terms, including any output-linked model, are agreed in the contract. They are not implied by this list.

  • 01Fee-for-service project
  • 02Full-time-equivalent process-development support
  • 03Technology-development package
  • 04Equipment and system engineering project
  • 05Pilot or kilo campaign, subject to facility scope
  • 06Long-term supply or manufacturing partnership, once licence and quality scope are confirmed
  • 07Co-development partnership
  • 08Flow-as-a-service or output-linked engagement, only after facility status, licences and the basis of supply are confirmed

What has to be true before manufacture is discussed

  1. Stage 01Feasibility
  2. Stage 02Optimization
  3. Stage 03This pageManufacture

A campaign or a longer engagement uses a process that already has an operating window. Length of supply, the equipment, and any output-linked commercial model are written into the agreement after the facility, the licence and the quality system are confirmed.

Next step

Send a confidential project brief.

Share the minimum the team needs to judge fit. Structures and proprietary files wait for an NDA or a secure exchange.